2nd UPGRADE REVITHOUSA LNG TERMINAL
GREECE
OVERVIEW
The Greek Minister of Environment and Energy cut the ribbon on the third and largest liquefied natural gas tank in #Revithousa. The upgraded terminal can turn Greece into a gas hub in Southeast Europe. We are proud to be a part of the project.
MV 850 BM/1 – 800
- 3 Sets
- Q = 6582 m3/h
- H = 55 m
- 1350 kW – 740 RPM